Delivered under active traffic conditions, this 7.5-kilometre roadway rehabilitation strengthened safety, traffic flow, and long-term reliability for the travelling public.
Completed on schedule and to specification—enhancing connectivity and delivering a durable roadway designed for heavy traffic volumes and Alberta’s demanding climate.

Remove/replace telecom manhole, integrate with live fibre, full surface restoration in a heavily trafficked corridor
Minimal public disruption through proactive planning, traffic accommodation, and strict safety controls
Completed efficiently to safety, quality, and schedule requirements

150+ km duct and fibre installation using ~80% plow and ~20% HDD across varied terrain
Expanded rural and regional broadband connectivity with minimized surface disruption
Delivered safely, efficiently, and on schedule